View Single Post
Old 03-17-2007   #1 (permalink)
Julien321


 
 

How to make full drive C: backup using auto schedule with Ultimate

Using Ultimate and like to do a full backup once a week. I see how to
schedule limited data file backups but don't see a way to schedule the full
backup. How do I set the schedule for a full backup so I don't have to worry
about forgetting?
My System SpecsSystem Spec