Problem with circular references

Hi newsgroup

I have a little problem in designing my assemblies.

Following situation:

1. I have 3 Assemblies: Assembly_A, Assembly_B and Assembly_C
2. Assembly_A has a Collection of Assembly_C
3. Assembly_B has as Collection of Assembly_C
4. Assembly_C has a Object of Assembly_A and another one of Assembly_B

So that's the situation and the situation must be like this (relationally)
because Assembly_A and Assembly_B represent contractors and Assembly_C
represents the contract. A contract is made between A and B.

Both contractors can have n contracts. A contract has one A and one B.

When trying to build this solution with team build the build process stops
in case of circular references.
It is logical, because A cannot be build until C is build and C cannot be
build until A is build.

Now my question. Is there a desing that don't destry the logic of the
depencies between the assemblies but don't result in build errors.

If not, what kind of design should I use for cases like this?

Thanks for every suggestions and help!

Best regards

D.H. Lee