![]() |
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
| Welcome to Windows Vista Forums. Our forum is dedicated to helping you find solutions with any problems, errors or issues you are experiencing with Windows Vista. The Vista forum also covers news and updates and has an extensive Windows Vista tutorial section that covers a wide range of tips and tricks. |
| |||||||
![]() |
| |
| | #1 (permalink) |
| | DPM setting up VM protection When trying to set up protection of a VM (this is true for VMs only but not all VMs) during the final step it fails with the following error: Modify protection group: <protection group> failed: Error 360: The operation failed due to a virtual disk service error Error details: The parameter is incorrect Recommended action: Retry the operation. Allocate Replica For \Backup Using Child Partition Snapshot\<computer name> failed: Error 360: The operation failed due to a virtual disk service error Error details: The parameter is incorrect Recommended action: Retry the operation. Any clue as to what could be wrong? I am running data protection manager 2007 SP1 version 2.0.8836.0 on Windows Server 2003 R2 x64 service pack 2. The VM is running windows vista x64 service pack 2 under Hyper-V manager (I believe all our hosts are all Vista x64 core). |
My System Specs![]() |
| | #2 (permalink) |
| | Re: DPM setting up VM protection =?Utf-8?B?ZmVucmlyX2Rhcmt3b2xm?= <fenrirdarkwolf@xxxxxx> wrote in news F0A571F-07CD-451B-A14A-8AC3DE52BD00@xxxxxx:Quote: > QUESTION SNIPPEd Peace and Grace, -- Gregory A. Beamer MVP; MCP: +I, SE, SD, DBA Twitter: @gbworld Blog: http://gregorybeamer.spaces.live.com ******************************************* | Think outside the box! | ******************************************* |
My System Specs![]() |
![]() |
| Thread Tools | |
| |
Similar Threads | ||||
| Thread | Forum | |||
| Password Protection | Vista security | |||
| Enough Protection? | Vista General | |||
| Setting restore point weekly using Task Scheduler is not setting RP. | Vista performance & maintenance | |||
| Setting restore point weekly using Task Scheduler is not setting RP. | Vista General | |||
| AV Protection | Vista General | |||